SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

A STEP in the Right Direction: Modeling AC Losses in a Tokamak Design

A STEP in the Right Direction: Modeling AC Losses in a Tokamak Design

The Spherical Tokamak for Energy Production (STEP) program aims to deliver a prototype fusion energy plant in the ...

Battling Corrosion in Nuclear Waste Storage Facilities

Battling Corrosion in Nuclear Waste Storage Facilities

Nuclear sites in Italy are being decommissioned, leaving questions about how to safely manage and store radioactive ...

Multiphysics Protects Wind Turbines when Lightning Strikes

Multiphysics Protects Wind Turbines when Lightning Strikes

Lightning Technologies, an NTS company, is a world leader in the design and validation of sophisticated lightning ...

Shape Changing Lubricants

Shape Changing Lubricants

Shell Global Solutions UK is conducting research to optimize lubricants for the fuel economy. A problem exists in ...