National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Identifying the Root Cause of Electronics Failures with Simulation Apps
The Centre for Electronic Corrosion (CELCORR) research group at the Technical University of Denmark predicts ...
Revving up Electrohydraulic Power Steering with Virtual Prototyping
In the automobile industry, the only thing faster than the cars that are produced is their design cycle. Validation ...
Simulation-Based Design of New Implantable Hearing Device
Cochlear Technology Centre Europe (CTCE) develops new technology for hearing implants. Their current work is with a ...
From Nanoantennas to Deep Space Satellites, Electron Emission Enables Efficient Power Generation
Researchers from the Italian Institute of Technology (IIT) and the European Space Agency (ESA) are developing power ...